Common Sense for Reefer Container PTI Check Procedures

[点击量:894]    [来源:www.adp.com.cn]

Shipping with reefer containers requires a lot of attention to ensure safety for cargo in transit. All reefer boxes, therefore, must pass a thorough Pre-Trip Inspection (PTI) prior to each time of stuffing.

The PTI is actually an extensive check of both the container and the machinery. This inspection ensures that the reefer machinery is running properly at correct settings and that the container body is clean and undamaged.

Shippers might not care much about PTI, because that’s usually shipping companies’ job. In some cases, however, shippers own reefer containers (SOC) and need to do PTI themselves or use the service of equipment-handling contractors. In any way, it is useful for customers to have general ideas about how the container inspection is carried out before they can stuff cargo.

Specific sequence in PTI procedures for reefer containers may vary a little bit among shipping companies. Yet PTI basically include following steps, which can be kept as check procedures for reference.

Before Power On

After power on

Final check

It’s worth noting that above content is only the guideline and should not replace or override PTI procedures recommended by the manufacturer of a particular refer container or the procedures set up by an individual shipping company.